One complete set of construction documents:
Construction documents shall show:
Manufacturers catalog cut sheets for all devices and appliances
Documentation on sealing of all penetrations
Battery calculations
Central Station Information-must be listed by UL or FM
The following will be checked at the time of the acceptance test
Will sound pressure levels for audible indication devices meet the requirements of NFPA 72 and the International Building Code?
Will visible appliances meet the requirements of NFPA 72, International Building Code and the ADA guidelines?
Fire alarm control panel(s) and remote annunciator(s) shall visibly display the location of the alarm in alpha-numeric text
Contact InfoPhone (314) 837-4894 661 St. Ferdinand St. |
Quick Links |
Latest News
|